FAIL (the browser should render some flash content, not this).
FAIL (the browser should render some flash content, not this).
img img img img img img img img img img
CSS GROUP DIRECTORY
 
 
  SEARCH
 
   
 
CONSOLIDATED SHIPPING LOGISTICS CENTER

FAIL (the browser should render some flash content, not this). A clear vision of establishing our own state-of-the-art facility in the Jebel Ali Free Zone became a reality in September 2002 with the commissioning of Consolidated Shipping Logistics Centre 1. Built within a sprawling area of 200,000sqft in the heart of the free zone, CSLC 1 today has become a landmark of success for the CSS Group.

 

THE HIGHLIGHTS OF CSLC 1

The facility has been designed and built keeping in mind the latest trend in the industry. Some of the features that makes us one of the leading service providers are:

    The Facilities / Strengths
  • Total area of 200,000 sq.ft.
  • 80,000 sq.ft. State-of-the art insured warehouse facility
  • 4535 pallet positions
  • 10,000 CBM capacity
  • 12 custom built dock levelers that facilitate easy access to trailers, ensuring safe and efficient loading and unloading of cargo
  • Health Safety Environment' (HSE), with the latest fire protection systems
  • Managed and operated by CSS staff and equipments
  • 12,000-sqft modern administrative set-up
  • All operations are monitored by CCTV
  • Chemical warehouse facility to be added in 2011/2012





USEFUL LINKS
 
    Reach Us
Email us
Enquiry form
Customer Feedback
Office Locator
 
 
 
 
 
FAIL (the browser should render some flash content, not this).
 
Terms of Use | Privacy Statement
© 2008 CSS Group. All rights reserved
HOME   |   ABOUT US   |   CSS GROUP   |   SERVICES   |   NETWORK  |   ONLINE SUPPORT   |   CAREERS  |   NEWS  |  CONTACT US  |  SITEMAP