CSS Group’s Sales team Jebel Ali was contracted to move four Pressure vessels. These were transported from the client’s yard to Jebel Ali port and were then loaded onto the Break-bulk vessel on a direct delivery basis for discharge at Kandla Port. The cargo included Slug Catcher – 164.8 Tons (31 length x 6 width x 7 height meters), Production Separator – 157.61 Tons (31 length x 6 width x 7 height meters), Dehydrator – 68.8 tons (26.7 length x 4.25 width x 4.3 height meters) and Degasser – 14 tons (10.1 length x 3.32 width x 3.42 height meters). The operation extended for three days started from 9th to 11th March 2011. The movement included the use of special transport equipment’s like Hydraulic trailer and Dolly trailer to transport these units to Jebel Ali port. The whole critical operation was supported and coordinated by the CSS staff onsite to ensure smooth operation. This Project movement is yet another example of the exemplary services provided by CSS Group.